top of page

VIP Announces New Water Pipeline

New Waterline adds critical infrastructure

Phase 1 + 2 - Vegas Industrial Park

Vegas Industrial Park is pleased to announce the design and construction of a new 24" Pipeline to the Property. Design of the system commenced summer 2022 and the construction is anticipated to be complete in summer 2024. The water pipeline and the first 12 mW of power will be delivered at the same time.

Vegas Industrial Park by Tres Advisory Group. 14075 Grand Valley Pkwy, Moapa, NV 89025, USA

Contact us | Kevin Keating | CEO | kk@tresadvisorygroup.com(702) 509-9627
Alexis Steffen | Director of Operations | alexis@tresadvisorygroup.com(702) 321-5124

Vegas Industrial Park is 913 acres located in the apex area of the City of North Las Vegas offering over 27 pads ranging in size from 10-70 acresIP is planned for major industrial users. There is a Super Pad of 200 acres partially graded and ready for development. VIP will comprise large scale industrial manufacturing, distribution, and warehouse and fulfillment buildings. VIP has the ability to offer extensive yard space and build-to-suit options.

© 2021 Ripe Creative.

bottom of page